亚洲一本之道高清乱码_heyzo高无码国产精品_国产丶欧美丶日本不卡视频_亚洲三级电影网,亚洲中文字幕无码天堂男人,一级电影免费看,亚洲色精品vr一区二区三区

News

Kazakhstan Project HL-6 Team received Party A’s KAM reward

Date 2012-04-19

In Party A’s KAM drilling construction, the Kazakhstan Project HL-6 Team’s reached Party A’s requirements for the three wells of K174, K176 and K192 in aspects of construction cycle, and site management, for which it received 200,000 KZT (about USD1351), 100,000 KZT (about USD676) and 300,000 KZT (about USD2027) in bonus respectively.

 

K174 Well needs winter operation, the drilling cycle is 11 days; K176 Well needs summer operation, the drilling cycle is 11 days; K192 Well also needs summer operation, the drilling cycle is 9 days. The drilling cycles of these three wells all exceed Party A’s indicator.

 

KAM project features harsh climate environment, in winter the temperature drops to 30 degrees below zero, in summer the temperature rises to 50 degrees. All members of HL-6 Team have no fear of coldness and heat, aiming to establishing Hilong’s brand image, they overcame all difficulties to safely and successfully completed construction tasks of all the wells, and recorded outstanding performance, which enhanced Hilong’s competitiveness in the Kazakhstan market.

 

HL-6 drill rig towering at Kazakhstan well site

主站蜘蛛池模板: 龙海市| 新田县| 红桥区| 萝北县| 霍州市| 江安县| 仙居县| 鹿泉市| 永兴县| 祁东县| 缙云县| 石楼县| 资源县| 清涧县| 葵青区| 林西县| 河北区| 景泰县| 顺义区| 东台市| 平泉县| 阿合奇县| 织金县| 阿鲁科尔沁旗| 四子王旗| 剑川县| 罗田县| 北票市| 涿鹿县| 无极县| 新源县| 云龙县| 兴文县| 蕲春县| 文水县| 天等县| 兴宁市| 新巴尔虎右旗| 德兴市| 曲松县| 会东县|